The City of Henderson is actively working on signal timing in the Boulder Highway corridor to improve commute times as much as possible. Check out the free Waze app to navigate construction impacts and find the best route to your destination.
Construction Updates
Segment 1: Wagon Wheel Drive to Greenway Road
Work Hours: 6am-4pm
One lane open in each direction (two lanes when available)
Curb and gutter, streetlight, signal, and ITS conduit installation
Segment 2: Greenway Road to Water Street
Work Hours: 6am-4pm
Two lanes open in each direction
Streetlight, signal, and ITS conduit installation, concrete bus pads, sidewalk
July 8: Median access changes at Boulder Highway/Henderson Shopping Plaza and new access at Pioneer Street. Details on our Median Access Closures page.
Segment 3: Water Street to Tulip Falls Drive
Work Hours: 6am-4pm
Two lanes open in each direction
Traffic shift from Gibson Road to Warm Springs Road, streetlight, signal, irrigation, and ITS conduit
July 14-17: Asphalt removal in the outside lanes of northbound and southbound Boulder Highway from Gibson Road to Sunset Road. Watch for intermittent impacts to driveways and cross streets as equipment moves through these areas.
Boulder Highway. Reimagined.
The City of Henderson’s Reimagine Boulder Highway is a historic roadway project that aims to make a generational impact by reshaping the future and safety of one of Nevada’s oldest thoroughfares, Boulder Highway. This 7.5-mile construction project, designed with community input, will bring several vital roadway improvements, such as center-running transit lanes with enhanced passenger shelters, upgraded storm drain system, new traffic signals, improved lighting, elevated buffered bike lanes, landscape treatments, and more.
Reimagine Boulder Highway will not only transform one of our City’s most historic roads, it will improve the surrounding area and create positive change for residents and businesses along the corridor for years to come.